Phase 1 / direct local route

Long-target recovery for 13BB:A

A technical recovery run showing that the long candidate chain can complete when prediction bypasses the public synchronous Worker/Tunnel route.

Prediction

ok
13BB:A completed via DIRECT_M3MAX_URL.

Wall clock

280.38 s
Longer than public synchronous route tolerance.

Paper meaning

route
This is an orchestration finding, not a model-quality claim.

Run Metadata

FieldValue
Run IDphase1-rehearsal-2026-05-13-direct-long-13bb-simplefold-100m
Modelsimplefold-100m
Routelocal runner -> http://127.0.0.1:8001/predict, with public Workers still used for DOI/PDF/PDB/scoring state
Durable Object audit entries11
ScopeDirect-route technical recovery only, not a final Phase 1 benchmark result.

Outcome

TargetOutcomepLDDT meanWall clocksequence-aligned lDDTTM-scoreRMSD
13BB:Apredicted and scored76.2393280.38 s0.84310.95671.92

Technical Finding

The earlier public-route rehearsal hit HTTP 524 for 13BB:A. The direct local route completed the same long target. Final Phase 1 should use direct local prediction or async job orchestration for long-bin targets.

Artifacts