Submission hardening / repeat controls

Phase 1A selective repeat-control plan

A bounded repeat experiment for hard/coverage and long-bin targets, designed to strengthen runtime and pLDDT interpretation without expanding the whole benchmark.

Existing anchor

13CZ
Three-run mid-bin repeat/cache control already exists.

Hard target

11BC
Two repeats planned for coverage-caveat behavior.

Long target

9K9Y
Two repeats planned for long-bin timing and confidence.

Repeat Set

TargetWhy repeatExistingPlanned
13CZ:AExisting mid-bin repeat/cache anchor.3 runsnone
11BC:CHard/coverage target with only 63 aligned residues.1 run2 additional runs
9K9Y:ALong-bin target with strong quality and ligand-context caveat.1 run2 additional runs

Run IDs

Definition Of Done

Source document: docs/40_phase1a_repeat_controls_plan.md.